

With xdock customer load data received at 4:13pm by ERH, carriers are able to plan and confirm booking times within minutes in Mobiledock—most by 4:30pm. Bookings are then locked at midnight, an enhancement driven by ERH to ensure consistency and control.
The impact:
• 3 hours earlier shift completion on peak days
• 100 trucks/day, 2,500 pallets/day — controlled and predictable
• 1.5 hours earlier carrier comms
A sincere thank you to David Papadopoulos and the ERH Fernhurst team for hosting and sharing your insights.